Diploma In Mechanical Engineering (Semester 6)
Total marks: 100
Total time: 3 Hours
INSTRUCTIONS
(1) Draw neat diagrams wherever necessary.
1.a. Attempt any THREE of the following:
1.a.i.
State any six techniques used for improving productivity.
(4 marks)
11098
1.a.ii.
What is productivity of materials? How it differs from
total productivity?
(4 marks)
11099
1.a.iii.
Suggest most appropriate type of production system for
manufacturing.
1) Sugar
2) Nuts and bolts
3) Connecting rods
4) Plastic bottles
(4 marks)
11107
1.a.iv.
State different activities involved in dispatching function
of PPC.
(5 marks)
11108
1.b. Attempt any ONE of the following:
1.b.i.
Differentiate between product layout and process layout on
the basis of
1) Initial investment cost
2) Cycle time
3) Type of machines used
4) Skill of labour required
5) Inventory levels
6) Arrangement of machines.
(6 marks)
11109
1.b.ii.
Describe use of Gantt chart for scheduling and recording
actual progress of work by considering suitable data.
(6 marks)
11110
2. Attempt any TWO of the following:
2.a.
What are the important factors affecting selection of site for a
new plant?
(8 marks)
11111
2.b.
Write step wise procedure for converting raw material into
finished product.
(8 marks)
11112
2.c.
Prepare operation process sheet and sequence of operation
for component shown in Fig. No.1. Assume suitable cutting
parameters.
(8 marks)
11113
3. Attempt any FOUR of the following:
3.a.
Suggest appropriate material handling device for
(i) Transporting coal in thermal power plant
(ii) Transporting cotton in ginning unit
(iii) Transporting pallets
(iv) Transporting packed boxes of biscuits within industry.
(4 marks)
11114
3.b.
State different factors affecting process planning.
(4 marks)
11115
3.c.
What is combined operation? Give two examples of combined
operations.
(4 marks)
11116
3.d.
Describe working of screw conveyor with neat sketch.
(4 marks)
11118
3.e.
State basic procedure for carrying out method study.
(4 marks)
11120
3.f.
State different components of jigs/fixtures.
(4 marks)
11122
4.a. Attempt any THREE of the following:
4.a.i.
What is fool proofing of jigs and fixtures? State its
importance.
(4 marks)
11125
4.a.ii.
State basic difference between push and pull type of
manufacturing system.
(4 marks)
11128
4.a.iii.
Give classification of sensors used in robot.
(4 marks)
11130
4.a.iv.
Which technique is used for continuous improvement?
What is the concept behind it?
(4 marks)
11133
4.b. Attempt any ONE of the following:
4.b.i.
A particular activity of shop floor consists of three
elements. The allowances are expressed as percentage
of normal time. Calculate standard time for each of the
activity from following data.
(6 marks)
11135
4.b.ii.
What is meant by ā5sā? Explain each āSā in details.
(6 marks)
11137
5. Attempt any FOUR of the following:
5.a.
State any four principles of jig and fixture design.
(4 marks)
11138
5.b.
Draw proportionate sketch of template jig. State its use.
(4 marks)
11139
5.c.
What is lean manufacturing? State its benefits.
(4 marks)
11142
5.d.
State any four types of grippers used in robots with one
application of each.
(4 marks)
11143
5.e.
Describe spherical configuration used in robot with neat sketch.
(4 marks)
11144
5.f.
What are the advantages of hydraulic actuators?
(4 marks)
11145
6. Attempt any TWO of the following:
6.a.
What is scheduling? State internal and external factors affecting
scheduling.
(8 marks)
11147
6.b.
(i) Sketch the symbols of following therbligs
1) Transport loaded
2) Search
3) Rest
4) Assemble
(ii) Construct two handed process chart for assembly of nut,
bolt and washer.
(8 marks)
11150
6.c.
Describe any two types of joints used in robotic arm and
wrist.
(8 marks)
11148