Software Engineering : Question Paper Dec 2015 - Information Technology (Semester 6) | Mumbai University (MU)
1 Answer
0
3views

Software Engineering - Dec 2015

Information Technology (Semester 6)

TOTAL MARKS: 80
TOTAL TIME: 3 HOURS
(1) Question 1 is compulsory.
(2) Attempt any three from the remaining questions.
(3) Assume data if required.
(4) Figures to the right indicate full marks.
1 (a) Is agile process suitable for large scale projects? Mention few issues.(5 marks) 1 (b) Explain process framework.(5 marks) 1 (c) Mention SQA activities.(5 marks) 1 (d) Explain CMM level 4 and level 5.(5 marks) 2 (a) Mention the reasons for project delay. What are the risks associated with project delay?(10 marks) 2 (b) Estimate the effort using function point method to design a user interface for the public to report about damaged pathole. Assume suitable input complexity and justify your assumptions.(10 marks) 3 (a) Explain in detail Spiral model and compare it with component model.(10 marks) 3 (b) Explain architectural design for e-Commerce System.(10 marks) 4 (a) Prepare SRS for the Course Management System.(10 marks) 4 (b) List down the activities required for scheduling and tracking software projects.(10 marks) 5 (a) Describe in detail white box techniques.(10 marks) 5 (b) Draw use case sequence diagram (withdrawal) for ATM banking system.(10 marks) 6 (a) In a car service station, complaints are taken and an estimate of the work is given immediately. Resources are assigned to the job. Once repaired a bill is prepared for actual cost. Prepare a DFD up to level 2 and make a sample entry in data dictionary for each element.(10 marks) 6 (b) Explain how are change control and version control are carried out.(10 marks)

Please log in to add an answer.