Industrial Engineering & Management - May 2016
Mechanical Engineering (Semester 8)
TOTAL MARKS: 100
TOTAL TIME: 3 HOURS
(1) Question 1 is compulsory.
(2) Attempt any four from the remaining questions.
(3) Assume data wherever required.
(4) Figures to the right indicate full marks.
Write short notes on. (Any Four)
1(a) Contributions of F. W. Taylor in IE(5 marks)
1(b) MOST(5 marks)
1(c) Assembly line balancing(5 marks)
1(d) Computerized Relative Allocation of Facilities Technique (CRAFT)(5 marks)
1(e) Group Technology(5 marks)
1(f) Financial Statements(5 marks)
2(a) Why work study is valuable for production management? Define Work study, Method study and work measurement.(10 marks)
2(b) Define Value Engineering. Steps in value engineering Distinction between value engineering & value analysis.(10 marks)
3(a) Define micro motion study. What are therbligs? When it is used? List therbligs symbols, colour description, name and code.(10 marks)
3(b) Define plant layout. Enumerate and explain various factors to be considered in design of plant layout.(10 marks)
4(a) A time study was conducted on a job considering of three elements. Stopwatch reading in hundredth of a minute is given. Calculate standard time if allowance is 17%.
Elements | Stop-Watch Reading | Rating | ||||
i | II | III | IV | V | ||
A | 10 | 73 | 139 | 203 | 266 | 80 |
B | 25 | 88 | 155 | 218 | 280 | 100 |
C | 64 | 128 | 193 | 257 | 320 | 100 |