0
669views
A dimension 25mm is to be produced on a component. For inspection, four batches of 3 components each are taken.

A dimension 25mm is to be produced on a component. For inspection, four batches of 3 components each are taken. The observation made are given below:

Batch A B C D
Component 1 25.10 24.60 25.41 24.50
Component 2 24.90 25.20 25.15 24.94
Component 3 25.30 24.90 25.60 24.93

If the standard deviation of the dimension is 0.280 Plot the X chart and R chart. Take $A_2 = 0.58, D_3= 0, D_4= 2.11$

Please log in to add an answer.