Instrumentation Project Documentation and Execution Question Paper - May 2015 - Instrumentation Engineering (Semester 8) - Mumbai University (MU)
1 Answer
0
35views

Instrumentation Project Documentation and Execution - May 2015

MU Instrumentation Engineering (Semester 8)

Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary

Answer the following (Any Four):

1 (a) Define project and explain term predictability related to project. 5 marks

1 (b) Explain conduit and tray schedule. 5 marks

1 (c) Explain Sequential Function Chart (SFC) with example. 5 marks

1 (d) Explain the role of designer. 5 marks

1 (e) Explain ISA tagging process to indicate the instrument and its function. 5 marks

2 (a) Explain Project planning in details. 5 marks

2 (b) Draw and explain electronic and pneumatic loop writing diagram for level control loop. 5 marks

Explain the following:

3 (a) (i) Junction box schedule 5 marks

3 (a) (ii) Air header schedule. 5 marks

3 (b) Explain Factory Acceptance Test and Site Acceptance test. 5 marks

4 (a) Draw and explain hook up diagram for flow and temperature measurement. 5 marks

4 (b) Explain in short HMI specification 5 marks

5 (a) Explain the specification sheet for DP transmitter and control valve. 5 marks

5 (b) Describe the different Standards used for instrumentation project. 5 marks

6 (a) Draw and explain the Instrument location plans with example. 5 marks

Explain the following project activity:

6 (b) (i) O & M manual 5 marks

6 (b) (ii) Commissioning 5 marks

Write a short note on any two:

7 (a) Project Deliverables 5 marks

7 (b) Checkout procedure for Temperature transmitter and control valve. 5 marks

7 (c) Software packages for Documentation. 5 marks