0
5.2kviews
Design a new flexible pavement for two lane undivided carriageway using the following data:
| written 7.1 years ago by | • modified 3.9 years ago |
Design CBR value of subgrade = 5.0 % Initial traffic on completion of construction = 300 cv per day Average growth rate = 6.0 % per year Desgin life = 10 years VDF value = 2.5
Mumbai university > civil engineering > sem 5 > transportation engineering 1
ADD COMMENT
EDIT
1 Answer

and 4 others joined a min ago.
and 5 others joined a min ago.